Projects

Ongoing Projects

MSAF Islamabad Development Project. Phase 1: Mosque, Multi-Purpose Hall, Mix-use and Residential Blocks

AMJ International Grant Funded Construction Projects
Project Name:
MSAF Islamabad Development Project. Phase 1: Mosque, Multi-Purpose Hall, Mix-use and Residential Blocks
Location: Tilford, Surrey, UK
Commenced: 24th October 2016

  • Demolition of existing and clearing land.

    Demolition of existing and clearing land.

  • Multi-purpose hall foundation work following excavation and land clearance work.

    Multi-purpose hall foundation work following excavation and land clearance work.

  • Mosque foundation trench excavated and foundation stone set.

    Mosque foundation trench excavated and foundation stone set.

  • Multi-purpose hall foundation work. Concrete being poured for slab.

    Multi-purpose hall foundation work. Concrete being poured for slab.

  • Mosque foundation work. Concrete being poured for slab.

    Mosque foundation work. Concrete being poured for slab.

  • Multi-purpose hall steal erected. Mosque prep-work for reinforced concrete wall concrete pour.

    Multi-purpose hall steal erected. Mosque prep-work for reinforced concrete wall concrete pour.

  • Mix-use Block foundations trench excavated and concrete poured.

    Mix-use Block foundations trench excavated and concrete poured.

  • Mosque reinforced concrete wall complete. Multi-purpose hall roof decking work in progress.

    Mosque reinforced concrete wall complete. Multi-purpose hall roof decking work in progress.

  • Multi-purpose hall roof decking complete. Super-structure masonry blockwork in progress.

    Multi-purpose hall roof decking complete. Super-structure masonry blockwork in progress.

  • Mix-use Block ground floor slab concrete work pour complete, masonry brick-work in progress.

    Mix-use Block ground floor slab concrete work pour complete, masonry brick-work in progress.

AMJ Tanzania National Jamaat Mission Development. Phase 1:Mission Building

AMJ International Grant Funded Construction Projects
Project Name:
AMJ Tanzania National Jamaat Mission Development. Phase 1:Mission Building
Location: Dar es Salaam, Tanzania
Commenced: March 2016

  • Site clearance complete, excavation to commence.

    Site clearance complete, excavation to commence.

  • Foundation reinforcement bar assembly.

    Foundation reinforcement bar assembly.

  • Substructure complete, ground floor structural work commences.

    Substructure complete, ground floor structural work commences.

  • Ground floor and first floor structural work.

    Ground floor and first floor structural work.

  • Second floor reinforcement bar assembly.

    Second floor reinforcement bar assembly.

  • Second floor structural work in progress.

    Second floor structural work in progress.

  • Second floor structural work complete. Third floor structural work in progress.

    Second floor structural work complete. Third floor structural work in progress.

  • First floor blockwork in progress.

    First floor blockwork in progress.

  • Ground floor ceiling plasterwork.

    Ground floor ceiling plasterwork.

  • Fourth floor structural work in progress.

    Fourth floor structural work in progress.

  • Fourth floor structural work in progress, fifth floor structural work commences.

    Fourth floor structural work in progress, fifth floor structural work commences.

  • First floor stairwell blockwork in complete.

    First floor stairwell blockwork in complete.

  • Fifth floor and roof terrace structure complete, façade, plasterwork and rendering in progress.

    Fifth floor and roof terrace structure complete, façade, plasterwork and rendering in progress.

  • Stairwell skimming and painting in progress.

    Stairwell skimming and painting in progress.

  • First floor finishes and tilework in progress.

    First floor finishes and tilework in progress.

  • WC tilework in progress.

    WC tilework in progress.

  • Second floor corridor finishing in progress.

    Second floor corridor finishing in progress.

  • Third floor skimming in progress.

    Third floor skimming in progress.

  • Fifth floor plasterwork in progress.

    Fifth floor plasterwork in progress.

  • Roof terrace plasterwork façade rendering in progress.

    Roof terrace plasterwork façade rendering in progress.

Finished Projects

BaitulAhad Mosque Conversion

AMJ International Grant Funded Construction Projects
Project Name:
BaitulAhad Mosque Conversion
Location: Tsushima, Aichi, Japan
Commenced: 24 October 2014
Completed: 20 November 2015

  • Original existing building.

    Original existing building.

  • Stripping of Interiors.

    Stripping of Interiors.

  • Stripping of Interiors.

    Stripping of Interiors.

  • Interior Renovation.

    Interior Renovation.

  • Interior Renovation.

    Interior Renovation.

  • Exterior Renovation.

    Exterior Renovation.

  • Prefabricated Minaret.

    Prefabricated Minaret.

  • Prefabricated Dome.

    Prefabricated Dome.

  • Exterior Works

    Exterior Works

  • Exterior Works

    Exterior Works

  • Exterior Works

    Exterior Works

  • Finished Interiors

    Finished Interiors

  • Finished Project

    Finished Project

  • Finished Project

    Finished Project

  • Finished Project

    Finished Project

  • Finished Project

    Finished Project

  • Finished Project

    Finished Project

Multi-function Hall and Hospitality suite, Basharat Mosque, Pedro-Abad, Spain

AMJ International Grant Funded Construction Projects
Project Name:
Multi-function Hall and Hospitality suite
Location: Basharat Mosque, Pedro-Abad, Spain
Commenced: 4th August 2014
Completed: June 2016

  • Structural works finished.

    Structural works finished.

  • Roof frame-work commenced. Steel ridge beam and steal rafters were welded in place. Clay panels were placed in between the rafters

    Roof frame-work commenced. Steel ridge beam and steal rafters were welded in place. Clay panels were placed in between the rafters

  • Props were removed at intervals.

    Props were removed at intervals.

  • Ground floor masonry work commenced.

    Ground floor masonry work commenced.

  • Masonry work continued.

    Masonry work continued.

  • Interior masonry work continued

    Interior masonry work continued

  • Interior masonry work complete

    Interior masonry work complete

  • Exterior cement plaster work commenced

    Exterior cement plaster work commenced

  • Building services work being carried out.

    Building services work being carried out.

  • Finished roof tiling.

    Finished roof tiling.

  • Interior surface finishing work being carried out.

    Interior surface finishing work being carried out.

  • Finished kitchen.

    Finished kitchen.

  • Finished multi-function hall.

    Finished multi-function hall.

  • Finished roof terrace.

    Finished roof terrace.

  • Finished facade works.

    Finished facade works.

  • Finished building front view.

    Finished building front view.

Kampala Mosque Extension

AMJ International Grant Funded Construction Projects
Project Name:
Kampala Mosque Extension
Location: Kampala, Uganda
Commenced: June 2011
Completed: July 2015

  • Exterior Works.

    Exterior Works.

  • Roof Ornament works.

    Roof Ornament works.

  • Minaret Works.

    Minaret Works.

  • Mosque and auxiliary building exterior renovation works.

    Mosque and auxiliary building exterior renovation works.

  • Finished Mosque

    Finished Mosque

  • Finished Mosque

    Finished Mosque

  • Finished Mosque

    Finished Mosque

Jamiat-ul Mubashireen Exisiting Student Hostel Rennovation

AMJ International Grant Funded Construction Projects
Project Name:
Jamiat-ul Mubashireen Exisiting Student Hostel Rennovation
Location: Jamiat-ul Mubashireen, Eekrawfo, Ghana
Commenced: 28th March 2016
Completed: 1st July 2016

  • Existing Student Hostel before Renovation

    Existing Student Hostel before Renovation

  • Existing Student Hostel before Renovation

    Existing Student Hostel before Renovation

  • Existing Student Hostel before Renovation

    Existing Student Hostel before Renovation

  • Timber frame roof upgrade in progress

    Timber frame roof upgrade in progress

  • Timber frame roof upgrade in progress

    Timber frame roof upgrade in progress

  • Aluminium roofing sheet upgrade in progress

    Aluminium roofing sheet upgrade in progress

  • Internal ceiling upgrade in progress.

    Internal ceiling upgrade in progress.

  • Paintwork carried out.

    Paintwork carried out.

  • Student Hostel after Renovation

    Student Hostel after Renovation

  • Student Hostel after Renovation

    Student Hostel after Renovation

  • Student Hostel after Renovation

    Student Hostel after Renovation

Cotonou Mosque Extension

AMJ International Grant Funded Construction Projects
Project Name:
Cotonou Mosque Extension
Location: Cotonou, Benin
Commenced: 25th February 2016
Completed: September 2016

  • Mosque before Construction.

    Mosque before Construction.

  • Dome and Minaret before construction.

    Dome and Minaret before construction.

  • Demolition of dome

    Demolition of dome

  • Masonry work and columns casting in progress.

    Masonry work and columns casting in progress.

  • Masonry and Beams casting work in progress.

    Masonry and Beams casting work in progress.

  • Window arcs being cast

    Window arcs being cast

  • Roof slab being cast.

    Roof slab being cast.

  • Roof slab being cast.

    Roof slab being cast.

  • External tile work in progress

    External tile work in progress

  • Internal plasterwork in progress

    Internal plasterwork in progress

  • Minaret extension work in progress

    Minaret extension work in progress

  • Internal finishes in progress.

    Internal finishes in progress.

  • Finished minaret extension

    Finished minaret extension

  • Finished interior

    Finished interior

  • Finished interior

    Finished interior

  • Finished balcony

    Finished balcony

  • Finished extension front view

    Finished extension front view

  • Finished extension

    Finished extension

  • Finished extension

    Finished extension

MTA International Broadcast Studio Ghana

AMJ International Grant Funded Construction Projects
Project Name:
MTA International Broadcast Studio Ghana
Location: Accra, Ghana
Commenced: June 2015
Completed: October 2016

  • Casting of Foundations

    Casting of Foundations

  • Block-work up to plinth level and Casting of ground Beam.

    Block-work up to plinth level and Casting of ground Beam.

  • Casting of columns

    Casting of columns

  • Casting of columns

    Casting of columns

  • Column and beams steal assembly.

    Column and beams steal assembly.

  • Casting of Beams.

    Casting of Beams.

  • Casting of Beams.

    Casting of Beams.

  • Casting of top Beams.

    Casting of top Beams.

  • Casting of top Beams.

    Casting of top Beams.

  • Casting of top Beams.

    Casting of top Beams.

  • Timber ‘form-work’ disassembled.

    Timber ‘form-work’ disassembled.

  • Stair-case cast in place.

    Stair-case cast in place.

  • ‘Slab on grade’ floor concrete cast and studio area steel beams placed.

    ‘Slab on grade’ floor concrete cast and studio area steel beams placed.

  • MTA Ghana Studio front view.

    MTA Ghana Studio front view.

  • Masonry block-work commenced.

    Masonry block-work commenced.

  • Administration area masonry block-work complete.

    Administration area masonry block-work complete.

  • Administration area masonry block-work complete.

    Administration area masonry block-work complete.

  • Studio side ‘RCC’ roof slab cast in place.

    Studio side ‘RCC’ roof slab cast in place.

  • MTA Ghana Studio front view. Studio area masonry block-work in progress.

    MTA Ghana Studio front view. Studio area masonry block-work in progress.

  • Interior finishing in progress.

    Interior finishing in progress.

  • Studio recording space.

    Studio recording space.

  • MTA Ghana Studio front view. Landscaping in progress.

    MTA Ghana Studio front view. Landscaping in progress.

  • MTA Ghana Studio front view. Landscaping in progress.

    MTA Ghana Studio front view. Landscaping in progress.

  • Broadcasting Studio Interior

    Broadcasting Studio Interior

  • Broadcasting Studio Interior

    Broadcasting Studio Interior

  • Control Room Interior

    Control Room Interior

  • Reception Interior

    Reception Interior

  • MTA Ghana Studio Front View

    MTA Ghana Studio Front View

  • MTA Ghana Studio Front View Night

    MTA Ghana Studio Front View Night

Nusrat Jehan Mosque/Mission Extension

AMJ International Grant Funded Construction Projects
Project Name:
Nusrat Jehan Mosque/Mission Extension
Location: Copenhagen, Denmark
Commenced: 29 June 2015
Completed: May 2016

  • Nusrat Jehan Mosque Existing auxiliary building. (2 Eriksminde Alle)

    Nusrat Jehan Mosque Existing auxiliary building. (2 Eriksminde Alle)

  • Existing auxiliary was demolished. (2 Eriksminde Alle)

    Existing auxiliary was demolished. (2 Eriksminde Alle)

  • Existing residential Building. (22 Kirkegade Road)

    Existing residential Building. (22 Kirkegade Road)

  • Existing residential was demolished. (22 Kirkegade Road)

    Existing residential was demolished. (22 Kirkegade Road)

  • 2 Eriksminde Alle, building excavation, foundation and basement works carried out.

    2 Eriksminde Alle, building excavation, foundation and basement works carried out.

  • 22 Kirkegade Road, building excavation, foundation and basement works carried out.

    22 Kirkegade Road, building excavation, foundation and basement works carried out.

  • 2 Eriksminde Alle, basement and ground floor works.

    2 Eriksminde Alle, basement and ground floor works.

  • 22 Kirkegade Road, basement and ground floor works.

    22 Kirkegade Road, basement and ground floor works.

  • 2 Eriksminde Alle, ground floor block-work.

    2 Eriksminde Alle, ground floor block-work.

  • 22 Kirkegade Road, ground floor block-work.

    22 Kirkegade Road, ground floor block-work.

  • 2 Eriksminde Alle, brick veneer work.

    2 Eriksminde Alle, brick veneer work.

  • 22 Kirkegade Road, brick veneer work.

    22 Kirkegade Road, brick veneer work.

  • 2 Eriksminde Alle, Brick veneer and roof works complete.

    2 Eriksminde Alle, Brick veneer and roof works complete.

  • 22 Kirkegade Road, Brick veneer and roof works complete.

    22 Kirkegade Road, Brick veneer and roof works complete.

  • Building services work.

    Building services work.

  • Building services work.

    Building services work.

  • 2 Eriksminde Alle, Window fitting.

    2 Eriksminde Alle, Window fitting.

  • 22 Kirkegade Road, Windows Fitted.

    22 Kirkegade Road, Windows Fitted.

  • Interior finishing works.

    Interior finishing works.

  • Interior finishing fittings and fixtures.

    Interior finishing fittings and fixtures.

  • Interior finishing fittings and fixtures.

    Interior finishing fittings and fixtures.

  • Interior finishing fittings and fixtures.

    Interior finishing fittings and fixtures.

  • Interior finishing fittings and fixtures.

    Interior finishing fittings and fixtures.

  • 2 Eriksminde Alle, Exterior finish work.

    2 Eriksminde Alle, Exterior finish work.

  • 2 Eriksminde Alle, Partial Completion.

    2 Eriksminde Alle, Partial Completion.

  • 2 Eriksminde Alle, Partial Completion.

    2 Eriksminde Alle, Partial Completion.

Jamia Ahmadiyya International, Student Hostels, Ghana

AMJ International Grant Funded Construction Projects
Project Name:
Jamia Ahmadiyya International, Student Hostels
Location: Jamia Ahmadiyya International, Mankessim, Ghana
Commenced: 29th June 2015
Completed: 25th June 2016

  • Over 3000 sqm of land cleared. Building profile marked out. Foundation trenches excavated.

    Over 3000 sqm of land cleared. Building profile marked out. Foundation trenches excavated.

  • Steel reinforcement pads and columns starters were placed. Foundation concrete was poured.

    Steel reinforcement pads and columns starters were placed. Foundation concrete was poured.

  • Blocks were laid to up to plinth level.

    Blocks were laid to up to plinth level.

  • Excavation was back-filled. Super-structure work commenced.

    Excavation was back-filled. Super-structure work commenced.

  • ‘Hostel A’ works

    ‘Hostel A’ works

  • Columns were cast and masonry block were laid up to roof level.

    Columns were cast and masonry block were laid up to roof level.

  • ‘Hostel A’ works

    ‘Hostel A’ works

  • Casting of ‘Hostel A’ beam.

    Casting of ‘Hostel A’ beam.

  • Sanitary drainage pipes were laid for washrooms.

    Sanitary drainage pipes were laid for washrooms.

  • Student Washrooms super-structure work and interior partition work commenced

    Student Washrooms super-structure work and interior partition work commenced

  • ‘Hostel B’ works

    ‘Hostel B’ works

  • ‘Hostel A’ all columns and beams were cast and block-work finished up-to roof level.

    ‘Hostel A’ all columns and beams were cast and block-work finished up-to roof level.

  • ‘Hostel A’ interior works.

    ‘Hostel A’ interior works.

  • ‘Hostel B’ works.

    ‘Hostel B’ works.

  • ‘Hostel A’ timber frame roof works commenced.

    ‘Hostel A’ timber frame roof works commenced.

  • ‘Hostel A’ timber frame roof works.

    ‘Hostel A’ timber frame roof works.

  • ‘Hostel A’ timber frame roof works.

    ‘Hostel A’ timber frame roof works.

  • ‘Hostel A’ timber frame roof works.

    ‘Hostel A’ timber frame roof works.

  • Timber frame roof works Complete.

    Timber frame roof works Complete.

  • Timber frame roof works Complete.

    Timber frame roof works Complete.

  • Roofing metal sheets fixed.

    Roofing metal sheets fixed.

  • Roofing metal sheets fixed.

    Roofing metal sheets fixed.

  • Roofing metal sheet work complete. Damp-proof applied.

    Roofing metal sheet work complete. Damp-proof applied.

  • Fine cement plaster work in progress with doors/window frames being fixed.

    Fine cement plaster work in progress with doors/window frames being fixed.

  • Exterior plaster work in progress with doors/window frames being fixed.

    Exterior plaster work in progress with doors/window frames being fixed.

  • Exterior plaster work in progress with doors/window frames being fixed.

    Exterior plaster work in progress with doors/window frames being fixed.

  • Exterior plaster work in progress with doors/window frames being fixed.

    Exterior plaster work in progress with doors/window frames being fixed.

  • Main Facade

    Main Facade

  • Rear facade

    Rear facade

  • Aerial View Student Hostel Courtyard

    Aerial View Student Hostel Courtyard

  • Student Hostel Courtyard

    Student Hostel Courtyard

  • Student Hostel Courtyard

    Student Hostel Courtyard

  • Internal Corridors

    Internal Corridors

  • Internal Corridors

    Internal Corridors

  • Typical Dormitory

    Typical Dormitory

  • Washrooms

    Washrooms